Next is Garden beds around the post and rail fences. Might need to think what I will use as the boarder of them.
Sunday, 1 November 2015
Letter Box and Gates!
Finally have the gates and Letterbox done, 3 coats of Sealer on them as well to hold the natural colour.
Next is Garden beds around the post and rail fences. Might need to think what I will use as the boarder of them.
Next is Garden beds around the post and rail fences. Might need to think what I will use as the boarder of them.
Friday, 16 October 2015
Turf Done!
Finally got the turf done today, and I came in 5 roles short......... But still looks great.
Gates and Letterbox Next. So happy with the finished look coming together!
Gates and Letterbox Next. So happy with the finished look coming together!
Monday, 12 October 2015
Front Post and Rail started
Finally have the font post and rail fences being done...... So close to actually getting turf laid once these are in.
Thursday, 8 October 2015
Rear and Side fences Done
Finally have the fences done, need to get the front yard started and then some gates and turf.
Slowly getting there.
Slowly getting there.
Monday, 5 October 2015
Friday, 2 October 2015
Saturday, 26 September 2015
Fences next!
Slowly getting there, lot's of $$ to get all this done, going to need a 3rd Job.
But the materials for the fences have been delivered, so hopefully they will get a start on this early next week.
But the materials for the fences have been delivered, so hopefully they will get a start on this early next week.
Saturday, 19 September 2015
Concrete and hard work
Anther productive day today, started early at 6am, Had the front Pathway poured and the garden shed slab done out the back.
Continued backfilling the drainage trench with Aggregate and Dirt and covered the Ag pipe up.
Then finished off spreading the topsoil on the right side of house.
Sore but happy.
Continued backfilling the drainage trench with Aggregate and Dirt and covered the Ag pipe up.
Then finished off spreading the topsoil on the right side of house.
Sore but happy.
Friday, 18 September 2015
Part 3, Landscaping Weekend by weekend!
Topsoil down, trench dug for Ag pipe and drainage down side of house. Slight delay now on Turf due to fencing guys running late by 2 weeks. Might have to get creative with the topsoil.
Tuesday, 15 September 2015
Thursday, 10 September 2015
Landscaping underway
We got the bobcats to come in and level all the fill, and prepare the block for topsoil and turf. Know where the drainage needs to go in now, and also some other little retaining walls we have to do, but we are at least ready for some grass:)
Subscribe to:
Posts (Atom)